Following our successful history working with Origin Energy, a follow-up contract was awarded for the construction of a 790ML brine pond. The pond provides additional brine storage at Origin Energy’s Talinga Water Treatment Facility near Chinchilla.
The scope of work included bulk earthworks, installation of two-layer HDPE plus Geonet, reinforced concrete, an Interpond Transfer System, pump station and access road.
79 Loudoun Road, Dalby QLD 4405
PO Box 279 Dalby QLD 4405
66 Smith Street, Darwin NT 0800
PO Box 447, Moora WA 6510
© RSA Copyright 2021 | Privacy Policy
Proudly built by iseekplant